Expediting

Expediting is a concept in purchasing and project management for securing the quality and timely delivery of goods and components.
The procurement department or an external expeditor controls the progress of manufacturing at the supplier concerning quality, packing, conformity with standards and set timelines. Thus the expeditor makes sure that the required goods arrive at the appointed date in the agreed quality at the agreed location.

Expediting exists in several levels:

  • Production control: The expeditor inspects the factory whether the production is up to the standards of the country the goods are destined for. This is especially necessary for food or engineering equipment like power plant components. He or she controls as
    well whether the regular audits for ISO 9001 etc. have been made.
  • Quality control: The components are tested whether they function as required and whether they are made to the measurements and standards of the customer. A part of this quality control can be the testing for compliance with standards of the destination
    country.
  • Packing/transport survey: This is the lowest and most used level of expediting, as the goods are only counted and the packing is controlled whether it will withstand the adversities of transport (pre-shipment inspection).
  • Project management: At a large-scale project, not only goods are controlled. The expediter also keeps an eye on the deadlines and milestones of the project and whether the supplier will be on time. This way he or she monitors the crucial procurement parts of the project.
(Visited 145 times, 1 visits today)
Share this:

Written by