The scope of MRP in manufacturing

The basic functions of an MRP system include: inventory control, bill of material processing, and elementary scheduling. MRP helps organizations to maintain low inventory levels. It is used to plan manufacturing, purchasing and delivering activities. “Manufacturing organizations, whatever their products, Read More …

Share this:

MATERIAL REQUIREMENTS PLANNING (MRP)

Material Requirement planning (MRP) is a technique used to determine the quantity and timing requirements of ―depended demand‖ materials used in the manufacturing operation. The materials can be purchased externally or produced in-house. The important characteristic is that their use Read More …

Share this:

Disadvantages of JIT

Some of the main problems with JIT are Its inability to deal with unforeseen circumstances Reliance on perfect quality of materials from suppliers Reduced flexibility to meet specific or changing customer demands Difficulty of reducing set up times and associated Read More …

Share this:

Advantages of JIT

The potential benefits of JIT to an organization and its purchasing function in particular, have been summarized as follows: Shorter lead-times Shorter time needed to make a product Higher equipment capacity and utilization Simplified planning and scheduling Less paperwork Less Read More …

Share this:

JUST IN TIME (JIT)

JIT is a philosophy of manufacturing based on planned elimination of all waste and continuous improvement of productivity. It encompasses the successful execution of all manufacturing activities required to produce a final product from design engineering to delivery and including Read More …

Share this:

INDEPENDENT DEMAND

1. FIXED ORDER QUANTITY With fixed order quantities, inventory is replenished with a predetermined quantity of every stock every time the inventory falls to a specific order level. The reorder level is the quantity to be used during the lead Read More …

Share this:

Meaning of independent and dependent demand

A major distinction in the way inventory planning and control is managed is whether demand for items in inventory is independent or dependent. Dependent demand items are typically subassemblies or component parts that will be used in the production of Read More …

Share this:

STRATEGIC PROCUREMENT PLANNING (SPP)

Strategic Procurement Planning is the transformation of an organization‘s mission, goals, and objectives into measurable activities to be used to plan, budget, and manage the procurement function within the organization. The ultimate goal is to bring about positive change in Read More …

Share this:

Individual procurement plans

Once a requisition or project plan is received determining an actual requirement, the procurement officer is then responsible for developing the individual procurement plan. The scope of the individual procurement plan will depend on the complexity of the requirement. While Read More …

Share this: